A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
A . In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.
B . In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.
C . In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.
D . In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.
-
An administrator plans to use bootable AIX media to boot a system into maintenance mode. The system is running AIX 5.3 TL09 with a64-bit kernel.The administrator has a selection of media available. Which media should the administrator use?()
A . AnyAIXbootablemedia,providingitisa64-bitvariant
B . AnyAIXbootablemedia,providingitisAIX5.1orlater
C . AnyAIX5.3bootablemedia,providingitisTL09orlater
D . AnyAIX6.1bootablemedia,providingitisTL02orlater
-
An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access. What preparation for moving the rack will result in the least disruption to end-users?()
A . Initiate LPAR fallover to backup systems.
B . Use Live Partition Mobility to move the LPARs to other systems.
C . Use Live Application Mobility to move critical applications to alternate systems.
D . Back up all LPARS to a NIM server and restore them to other LPARs on other systems.
-
What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX 6.1?()
A . 128M
B . 256M
C . 512M
D . 1024M
-
A system administrator has edited the necessary files for setup of an AIX system to serve as a bootp server. Which of the following commands is required to complete the activation?()
A . telinit -q
B . startsrc -s bootpd
C . refresh -s inetd
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
A . The system is waiting for user input to define console type lft0.
B . The system is waiting for user input to define console type tty0.
C . The system is waiting for user input to define console type vty0.
D . The system is waiting for user input to define console type vsa0.
-
An AIX system administrator has setup disk quotas. Where can the reports be found on the system?()
A . /var/adm/acct/sum
B . /var/adm/ras
C . /usr/sbin/acct
D . /var/adm/wtm
-
A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()
A . Perform Live Partition Mobility between the two systems.
B . Move the boot disks from the old system to the new system.
C . Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
D . Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.
-
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
A . 4
B . 8
C . 16
D . 32
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
A . The system is waiting for user input to define console type lft0.
B . The system is waiting for user input to define console type tty0.
C . The system is waiting for user input to define console type vty0.
D . The system is waiting for user input to define console type vsa0.
-
A customer recently acquired two Power servers and plans to implement AIX 6.1 and Live Application Mobility. What other product is required to accomplish this objective? ()
A . HACMP for AIX
B . PowerVM Enterprise Edition
C . IBM Management Edition for AIX
D . Workload Partition Manager for AIX
-
A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()
A . N7900
B . N6040
C . DS3300
D . DS3500
-
A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()
A . Etherchannel and trunking
B . Network Interface Backup and Etherchannel
C . Shared Ethernet Adapter (SEA) Failover and Etherchannel
D . Network Interface Backup and Shared Ethernet Adapter failover
-
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()
A . Create a system profile for each partition. Assign all needed resources as 'required'.
B . Define all system resources as 'desired' on the Testing partition. Activate only as needed.
C . Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.
D . Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
A . An additional switch for the new HMC
B . Asynchronous adapters on the new HMC
C . The two 570 servers are directly connected to the new HMC
D . One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
-
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()
A . Upgrade OS to AIX 5.2.
B . Implement Micro-Partitioning.
C . Upgrade HMC to support POWER5.
D . Install Partition Load Manager.
-
A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()
A . Build the logical partition infrastructure based on 6 or more VLANs.
B . Build the logical partition infrastructure based on two or more IVEs.
C . Build the logical partition infrastructure based on Partition Mobility.
D . Build the logical partition infrastructure based on redundant VIO Servers.
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
A . The system is waiting for user input to define console type lft0.
B . The system is waiting for user input to define console type tty0.
C . The system is waiting for user input to define console type vty0.
D . The system is waiting for user input to define console type vsa0.
-
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()
A . Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required.
B . Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required.
C . Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262.
D . Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
A . An additional switch for the new HMc
B . Asynchronous adapters on the new HMc
C . The two 570 servers are directly connected to the new HMc
D . One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
-
What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX 6.1?()
A . 128M
B . 256M
C . 512M
D . 1024M
-
An administrator has received an update CD with the latest technology level for AIX 5.3. The current operating system level of the server is at base AIX 5.3. What action needs to be taken to apply the new technology level to the server?()
A . Run smit update_all
B . Run smit install_all
C . Boot from the installation media
D . Run the update_all command from the mounted CD
-
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()
A . Create a system profile for each partition. Assign all needed resources as 'required'.
B . Define all system resources as 'desired' on the Testing partition. Activate only as needed.
C . Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.
D . Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.
-
Hamlet is characterized as a(an) ( ) on that, he loves good and hates evil; he is a man free from prejudice and superstition; he has unbounded love for the world and firm belief in the power of man.