-
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
A . Removes the requirement for Intelligent PDUs
B . Monitor and balance disk speeds according to utilization needs
C . Is a required element for EnergyStar certification of the server/data center
D . Monitor and report power and thermal trending to optimize energy consumptio
-
Most Navigation System equipment is()from the bridge, a unique location that allows for a centralized,safe and efficient management of ship navigation.
A . accessible
B . restricted
C . deterred
D . far away
-
A IBM Director V5 customer is considering Systems Director V6 and updating their BladeCenter servers. The sales professional is asked how BladeCenter Configuration Manager works with Director V6. Which of the following is correct?()
A . This was replaced by Configuration Manager for V6
B . This must be upgraded toBladeCenter Open Fabric Manager (BOFM) for V6
C . Automation Manager must be used with Director V6
D . This is common to both V5 and V6, no change is required
-
When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()
A . Upgrade to VMControl Standard Edition
B . Upgrade to VMControl Enterprise Edition
C . Upgrade to latest version of VMControl Express Edition
D . Download the latest fixes for VMControl Express Editio
-
Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()
A . Physically press the appropriate button on the system.
B . Physically disconnect and reconnect the power cable on the system.
C . Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
D . Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
-
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
A . Removes the requirement for Intelligent PDUs
B . Monitor and balance disk speeds according to utilization needs
C . Is a required element forEnergyStar certification of the server/data center
D . Monitor and report power and thermal trending to optimize energy consumption "Pass Any Exam. AnyTime." - 14 IBM 000-106: Practice Exam
-
IBM System x and BladeCenter systems use cooling technology that allows managed airflow to each component. What is the name of this technology?()
A . Calibrated Vectored Cooling
B . Rear Door Heat eXchanger
C . IBM Active Energy Manager
D . Light Path Diagnostic
-
Which storage system is this statement describing: A high-end, disk storage system with a virtualized grid architecture designed to eliminate the complexity of storage administration and make managing storage easy.()
A . XIV system
B . SONAS
C . DS8800
D . N serie
-
A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management. They require the ability to restart any server independent of the operating system. Which of the following is the most cost-effective solution?()
A . Interconnect the service processors and use the IBM Director Agent
B . Install RSA II in each server and chain together the systems management processors
C . Install the RSA II in the top server and chain together the service processor interconnect
D . Install the IBM Director Agent on each server and use the remote control function to restart the server
-
What is the effect of using Capacity on Demand on LPARs configured on a managed system?()
A . It allows dynamic increase of CPU and memory allocation for all LPARs.
B . It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' and 'Maximum' partition profile values are equal.
C . It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' partition profile values are less than the 'Maximum' values.
D . It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' partition profile values are greater than the 'Maximum' values.
-
In relation to the system’s Logical Memory Block (LMB) size, when creating an LPAR using Integrated Virtualization Manager (IVM), what is the largest allocation of memory allowed?()
A . 128MB
B . 256MB
C . 512MB
D . 1024MB
-
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
A . Free up one HMC and update the software for use with the p5 570
B . Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
C . Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
D . Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
-
A customer has a Linux server farm and wants to use IBM Director to manage all of their systems. Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()
A . Install Director Server on a Windows 2000 Server and install the Director agents on the Linux systems.
B . Install IBM Director Agent on a Linux server and install the Director Server on the Linux systems.
C . Install the Director Server on a Linux server and manage the systems via Linux native SNMP support.
D . Install Director Server on a Linux server and install the Director Linux agent on the Linux systems.
-
Which is a license scope option when managing activations for an IBM System Storage DS8100using the IBM Disk Storage Feature Activation (DSFA) application?()
A . Operating environment
B . Parallel access volumes
C . Point-in-time copy
D . Count Key Data
-
Effective systems management for all processor types that is easy to implement and use is needed. What processors are supported by the IBM BladeCenter?()
A . Intel/AMD/Power/Cell
B . Intel/Motorola/Zilog
C . Opteron/Dual Core/Quad Core
D . Celeron/Pentium/Xeo
-
()is the management system to control the material consumed reduce inventory in the manufacture company.
A . A.DPR
B . B.LPR
C . C.MRP
D . D.ERP
-
A customer needs 40 TB for Tier 2 Information Lifecycle Management (ILM) data installed on the System z/VM. Their current data center is critically short of floor space. Which of the following would satisfy the customer requirement()
A . a DS5300 withFibre Channel drives
B . an XIV with 15 modules of 1 TB drives
C . a DS5100 with 2 TB SATA drives
D . an XIV with 6 modules of 1 TB drive
-
You are speaking to an IT manager with 350 small servers. The IT manager is looking to reduce and consolidate systems. What strategy would you follow?()
A . Tell the customer that IBM has the best scale-out server strategy.
B . Show the benefit of server consolidation with IBM and the return on investment.
C . Find out the mixture of server processor and application type.
D . Tell the customer to buy smaller servers.
-
What is the effect of using Capacity on Demand on LPARs configured on a managed system?()
A . It allows dynamic increase of CPU and memory allocation for all LPARs.
B . It allows dynamic increase of CPU and memory allocation for LPARs when the ’Desired’ and ’,maximum’ partition profile values are equal.
C . It allows dynamic increase of CPU and memory allocation for LPARs when the ’Desired’ partition profile values are less than the ’Maximum’ values.
D . It allows dynamic increase of CPU and memory allocation for LPARs when the ’Desired’ partition profile values are greater than the ’Maximum’ values.
-
Which of the following features of Tivoli Storage Productivity Center is an enhancement to theStorwize V7000 GUI management system?()
A . provisioning
B . capacity management
C . performance analytics
D . replication management
-
A Customer has Director V5 installed and is considering Systems Director V6. They ask how BladeCenter Configuration Manager works with this new version. Which of the following is the correct answer? ()
A . This was replaced by Configuration Manager for V6
B . This must be upgraded to BladeCenter Open Fabric Manager (BOFM) for V6
C . This is common to both V5 and V6, no change is required
D . Automation Manager must be used in V6
-
________________ is an example of the operational purpose of the cost management system.
-
As the manager of an organization that is attempting to build a marketing information system (MIS), you have been informed that an MIS is built upon three fundamental information sources. The sources
A.external records and documents
B.databases found on the Internet
C.consultant reports
D.internal company records
E.secondary data from government sources such as the Better Business Bureau
-
The _____ is a general description of the architecture of a workflow management system used by the WFMC,in which the main components and the associated interfaces are summarized.
A.waterfallmodel
B. workflowreferencemodel
C. evolutionarymodel
D. spiralmodel