After an explosion,repair of emergency machinery and services should be accomplished().
A . after control of fire,flooding,and structural repairs
B . immediately,before the emergency is under control
C . after control of fire,but before control of flooding
D . after stability is restored
时间:2022-09-03 18:34:09
所属题库:紧急通信题库
相似题目
-
An inert gas system is designed to reduce the possibility of tank explosions by().
A . eliminating sparks and fire in the vicinity of cargo tanks
B . removing all hydrocarbon gases from the cargo tanks
C . blanketing cargo tanks with inert foam
D . reducing the oxygen concentration below levels necessary for combustio
-
An engineer, together with some motormen ()to help in the repair work.
A . send
B . sends
C . was sent
D . were sent
-
A vessel has been damaged by fire. The survey shows the cost of repairs will exceed the value of the repaired vessel. This is an example of a(n)().
A . constructive total loss
B . salvage loss
C . actual loss
D . preferred lo
-
Fix the fuel injector into () after repair.
A . the cylinder liner
B . the cylinder cover
C . the cylinder jacket
D . the pisto
-
The crankshaft deflection is at first to be () before and after repair.
A . disassembled
B . renewed
C . measured
D . regulated
-
The deck control valve to be()after being repaired.
A . moved and fitting again
B . removed and refitted
C . reproduced and put on again
D . return and attached agai
-
A firebox explosion in an automatically fired auxiliary boiler may be the result of ()
A . excessive purging before lighting off
B . insufficient trail for ignition period
C . a faulty transformer in the ignition circuit
D . insufficient purging before lighting off
-
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
A . selected
B . collected
C . detected
D . effected
-
The minimum concentration of a vapor in air which can form an explosive mixture is called the().
A . auto-ignition point
B . flash point
C . lower explosive limit (LEL)
D . threshold limit value (TLV)
-
After repair, the voyage trial of the M-E should be done ()
A . after the mooring trial has passed
B . before the mooring trial
C . under the surveyors supervision
D . after repair
-
After an engine is started you should().
A . increase engine speed to insure adequate flow of oil to all parts of the engine
B . pay no attention unless there are unusual noises from the engine
C . check operating pressures and temperatures,and check for leaks
D . run the engine at idle until the temperature has increased
-
The loss of () from an air compressor could lead to an overheated air discharge and possibly an explosion in the pipelines leading to the air reservoir.
A、lubricating oil
B、compressed air
C、cooling water
D、sealing ring
-
With ________ based CNC machine tool controllers, maintenance and repair are no longer an issue.pc
-
With ________ based CNC machine tool controllers, maintenance and repair are no longer an issue.
-
_______ means surgical repair of an organ.
-
3. You can send your iPhone to an
Apple Retail Store for repair in a shipping box provided by Apple and they will pay all the charges.
-
After the guests left, she spent half an hour ___?
After the guests left, she spent half an hour _______ the sittingroom.
A) ordering B) arranging C) tidying up D) clearing away
-
View the Exhibit to examine the error during the database startup.You open an RMAN session for the database instance. To repair the failure, you executed the following as the first command in the RMAN session:RMAN> REPAIR FAILURE;Which statement describes the consequence of the command?()
<img src='https://img2.soutiyun.com/ask/uploadfile/2019-03-27/31f166c0cedddf6946f2b336e2153075.jpg' />
A. The command performs the recovery and closes the failures.
B. The command only displays the advice and the RMAN script required for repair.
C. The command produces an error because the ADVISE FAILURE command has not been executed before the REPAIR FAILURE command.
D. The command executes the RMAN script to repair the failure and removes the entry from the Automatic Diagnostic Repository (ADR).
-
Before he started work, I asked the builder to give me an ________ of the cost of repairing the roof.
A) assessment
B) estimate
C) announcement
D) evaluation
-
By saying that the "blast wave" from the explosion acts like "an invisible wall of energy", the author intends to say that ______.
A.blast can cause shrapnel or other bits of metal to slice through flesh like a knife
B.its energy can cause a swath of disfiguring burns
C.this energy wall can prevent victims from physical injury and obvious bleeding
D.its tremendous energy can inflict massive internal injuries
-
听力原文: An explosion in a Pennsylvania coal mine killed one worker Monday, but five other miners escaped. The blast went off 2,300 feet underground at the R&D coal mine in Schuylkill County. Some officials say it appears a blast went off in the anthracite mine when workers detonated the explosives, but that’s still under investigation.
The process right now is to continue the interviews and then get back down underground and complete the inspections and in that way we can complete the investigation as to what happened.
The brother-in-law of the miner killed says 43-year-old Dlae Reightler worked at the mine since he was a teenager and that he dreamed of moving his wife and four children, setting up an auto-repair business.
He did it all his life. He did that and worked on cars in his garage backyard. He enjoyed doing that stuff.
At the mine, the accident knocked out the ventilation system, making it too dangerous for investigators to go down into the mine shaft. Regulators ordered the facility closed until the investigation is complete. The area has the nation’s only deposits of anthracite, a type of hard, clean burning coal. A June inspection of the site turned up no violations and violations detected in August were fixed on site.
The investigation was dangerous because ______.
A.the mine was badly damaged
B.the ventilation system was broken
C.the mine was too deep
D.the safety facility was destroyed
-
Developing an acquisition plan after a recent takeover is an example of a single-use p
是
否
-
Since it allows action to be taken to protect the environment at an earlier stage, it is no longer primarily a question of repairing damage after it has____()
A.endorsed
B.enhanced
C.occurred
D.related