The project()is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements,thresholds, and acceptance criteria.
A . work performance information
B . scope statement
C . changerequests
D . process analysis
时间:2022-10-22 03:15:43
所属题库:专业英语题库
相似题目
-
Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria ()is not a project selection method.
A . Benefitcontribution
B . Expertjudgment
C . Scoringmodels
D . Flowcharting
-
Which of the following is a key advantage of AIX v5.3 over AIX v5.2?()
A . Dynamic LPAR
B . Micro-Partitioning
C . Small Memory Real Mode
D . Capacity Upgrade on demand for memory
-
In Ireland()is the court of final appeal and plays a key role in the interpretation of the Constitution.
A . the Supreme Court
B . the High Court
C . the Highest Court
D . the Central Court
-
The team is going out to hold a party tomorrow after it__________the project.
A . completes
B . completed
C . will complete
D . will have completed
-
The key to rescuing a man overboard is().
A . Good communication
B . A dedicated crew
C . Good equipment
D . Well-conducted drill
-
A chart projection depicting the poles and a small area on either side of a connecting meridian,that is sometimes used for star charts,is the().
A . Azimuthal gnomonic projection
B . Lambert conformal projection
C . Transverse Mercator projection
D . Polyconic projectio
-
()is a type of bar chart that illustrates a project schedule. It illustrates the start and finish dates of the terminal elements and summary elements of a project.
A . A、gantt chart
B . B、project histogram
C . C、milestone chart
D . D、project flowchart
-
What is a key purpose of the Solutions Recommendation Guide?()
A . present Cisco products
B . provide a framework of tested and proven models
C . identify basic needs of the business
D . calculate the business need priority
-
What is a key advantage of the POWER5 technology over all other competitive offerings?()
A . POWER5 supports multiple operating systems.
B . POWER5 supports more nodes in a clustered environment.
C . POWER5 hypervisor has significantly less overhead than hardware partitioning.
D . POWER5 has greater granularity of resources such as memory, processors and I/O.
-
The key of paraphrasing is to interpret a sentence with much less words than original.
-
Which of the following is NOT included in the project descriptions of a proposal?
-
It is reported that a project to build the third longest bridge in the world is ________ these days.
-
100Interfacing with the customer after project go-ahead is the responsibility of: A.Projec
100 Interfacing with the customer after project go-ahead is the responsibility of:
A. Project sponsor
B. Project team
C. Project manager
D. Functional manager
E. All of the above are possible, based upon the size and complexity of the project
-
The difference between a project and a program is that:
A.A program is made up of multiple projects
B.A program requires at least three times longer to plan than a project
C.A project is a one-shot deal while a program is on-going
D.A and C
E.B and C
-
18Interfacing with the customer after project go-ahead is the responsibility of: A.Project
18 Interfacing with the customer after project go-ahead is the responsibility of:
A. Project sponsor
B. Project team
C. Project manager
D. Functional manager
E. All of the above are possible, based upon the size and complexity of the project
-
What is the key to a company's service according to the passage?
A.Relationships.
B.Interpersonal relationships.
C.Inter-group relationships.
D.Interdepartmental relationships.
此题为多项选择题。
-
The initial cost of your project is $25,000, which will save the company $6,000 per year for the next four years. Using the above table If your company wants a 12% ROI, what is the NPV of the project?
A.-$1,000
B._$6,772
C.+$1,758
D.+$6,772
-
For a project with uncertain future cash flows, the more the uncertainty is, the more the value of decision flexibility is.
-
Please select one word from the following NINE words, and fill in each blank.Although each project is unique, there are key concepts that a project manager can use to ______ and guide a project to com
A.contingency
B.flawless
C.coordinate
D.underbid
E.simultaneously
F.completenessG.trusteeH.disproportionallyI.workmanship
-
The postal sector is a key contributor to national and international i() (--the basic
The postal sector is a key contributor to national and international i() (--the basic physical and organizational structures and facilities (e.g.buildings, roads, power supplies) needed for the operation of a society or enterprise)
-
8、正平面上圆的斜二测是什么形状? What is the front projection of a circle?
A.椭圆ellipse
B.与视图相同的圆the same circle as the real size
C.放大1.22倍的圆 1.22 time circle
D.放大1.22倍的椭圆1.22 time ellipse
-
The project team developing a new system is experienced in the domain. Although the new the new project is fairly large, it is not expected to vary much from applications that have been developed by t
The project team developing a new system is experienced in the domain. Although the new project is fairly large, it is not expected to vary much from applications that have been developed by this team in the past. Which process model would be appropriate for this type of development?()
:A.prototyping
B.waterfall
C.V-model
D.spiral