During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()
A facility used for the discharge of a cargo of a particular hazard,such as chlorine,butane or ethane,must have what to warn water traffic of an immediate danger during fire or cargo release?()
A seaman lost his continuous discharge book during the voyage. Upon discharge from Articles,he should be issued a().
When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading containers are port of discharge,().
During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.
When loading or discharging dry mud or cement,crew members should use goggles and().
During loading or discharging,the tallymen must make contact with()on duty so as to solve problems in time.
()is known as a long hatch during loading operation.
()in a charter-party are working days on which the weather allows loading work or discharging work to be done.
During counterflooding to correct a severe list or trim aggravated by an off-center load,a ship suddenly takes a list or trim to the opposite side. You should().
A notice of readiness is not valid unless it indicates that the vessel is ready to load or discharge as the case may be,at the time()it is given.
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
All lighterage in or off ports of loading or ports of discharge shall be for the account of ().
The port clearance for a ship should be granted()the completion of loading or discharging in the port.
A sum of money paid by the Shipowner to Charterer for completing loading or discharging a cargo in less time than that stipulated in Charter Party as laydays.It is().
()cargo means to check all cargo loaded into or discharged from a vessel.
If the Charterer loads or discharges the vessel in a shorter time than is allowed to him by the lay days,he may be entitled to().
It’s possible to()out some cargo during loading.
103. When loading or discharging dry mud or cement, crew members should use goggles and ______.
When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.
During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.
A ship cannot start loading or discharging without Customs permission.()