The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
he Port Authorities, in accordance with the IMO resolutions have been carrying out () to enhance safety of ships.
The safety management objectives of the ISM Code are ().
What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate? ()
The Safety of Life at Sea Convention was developed by the().
The purpose of the GMDSS is to()safety of life and property at sea all over the world.
How many operators are needed/required on board according to the provisions of the International Convention for the Safety of Life at Sea,1974?().
If the named port is one at which no tugs are ever obtainable,and the chartered vessel can not,by reason of her size,reach that port without the assistance of tugs,the port is().
The certificate of nationality () serves as evidence of the nationality of the ship () shows the port of registry.
The Safety Equipment Certificate shows that the vessel conforms to the standards of the ().
Vessels,()support vessels,should not enter the safety zone of a deepwater port unless clearance has been obtained from the Vessel Traffic Supervisor.
The port clearance for a ship should be granted()the completion of loading or discharging in the port.
Precautionary measures must be taken to()safety of the steredortes, cargo and the ship.
The safety valve should be () in the presence of C/E and Surveyor.
Which two RSTP port roles include the port as part of the active topology?()
The purpose of the safety relief valves installed on an auxiliary boiler is to ().
What these young men were doing()a threat to the safety of the whole neighborhood.
The plunger in a jerk pump is rotated until the release port is uncoveredIf the port remains uncovered all of the time, which of the listed operations will occur?()
What is the use of work assets on safety plans? ()
The main objective of the SOLAS Convention is to specify () for the construction, equipment and operation of ships, compatible their safety.
()is not among the Safety management objectives of the Company.
We have()all the latest safety features into the design of the car.
Product safety means ensuring that the products entering the market are not harmful, it is totally the responsibility of the company.
We have all thelatest safety features into thedesign of the car.