During the dock repair, should be measured firstly before tail shaft drawn out()
A . the sinking of tail shaft
B . the clearance of stern bearing
C . the total flexure of shaft
D . main engine crankshaft deflectio
相似题目
-
This used piston had been tested and approved as a spare part by the () during last annual repair.
A . agent
B . shipchandler
C . surveyor
D . engineer
-
During the deck repair,() should be measured firstly before tail shaft is drawn out.
A . the sinking of tail shaft
B . the clearance of stern bearing
C . the total flexure of both end bearing
D . main engine crankshaft deflectio
-
During repair,lubrication lines and orifices must be ().
A . taken away
B . engaged
C . connected
D . sealed off
-
To ensure the quality of dock repair, C/E should know very well ()
A . the repair standard of main docking repair item
B . the special tool for repair item
C . the skill of repairer
D . the status of docking repair equipment
-
Which of the following items don’t belong to dock repair works?()
A . making the repair list, booking spare parts and special tools for the dock repair
B . shutting off all of the SW valves to outboard
C . the sketches or diagrams used for the dock repair
D . cleaning up the oil tank and boiler before enter the dock
-
A vessel has been damaged by fire. The survey shows the cost of repairs will exceed the value of the repaired vessel. This is an example of a(n)().
A . constructive total loss
B . salvage loss
C . actual loss
D . preferred lo
-
We have just repaired the motorRemember () to it during your watch.
A . to pay attention
B . paying attention
C . pay attention
D . your paying attentio
-
Pinching of the cargo hose between the vessel and the dock should be prevented by().
A . adjusting the hose supports
B . laying out an excess length of hose on deck
C . tying off the topping lifts and runners to winch heads
D . All of the above
-
Fix the fuel injector into () after repair.
A . the cylinder liner
B . the cylinder cover
C . the cylinder jacket
D . the pisto
-
During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()
A . chief engineer
B . surveyor
C . the engineer
D . the technique personnel of the shipyard
-
While the Pilot is maneuvering the vessel to a dock,what is the PRIMARY responsibility of the watch officer?()
A . Insure that helm and throttle orders given by the Pilot are correctly executed
B . Judge the appropriateness of the Pilot's orders and countermand them if necessary
C . Supervise the signaling and flag etiquette
D . Record the bells and their times in the bell book
-
()during the last repair?
A . Did you have No.4 cylinder repair
B . Do you have No.4 cylinder repaired
C . Didn’t you have No.4 cylinder repairing
D . Didn’t you have No.4 cylinder repaired
-
Which one of the following repair will cost the least cost?()
A . Routine docking repair
B . Voyage repair
C . Damage repair
D . Conversio
-
When the good sare ready,the shipping agent will()and()them to the docks.
A . deliver,collect
B . collect,send
C . deliver,send
D . collect,deliver
-
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().
A . bow and stern lines
B . breast lines
C . halyards
D . war
-
(),where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.
A . Voyage repairs
B . Routine docking
C . Damage repairs
D . Conversio
-
(), where minor repairs are carried out with a ship service, often during a stay in portThis may be remote from a ship repair site.
A . voyage repairs
B . routine docking
C . damage repairs
D . conversio
-
Why couldn't the woman find the repair shop?
A.She missed the fight turn.
B.The man gave her the wrong directions.
C.She W3S a bad driver.
-
How much will the repair parts cost?
A.The price can be negotiated with the dealer.
B.Depends on the current retail price.
C.Depends on the wholesale price.
D.The price can be found on the company webpage.
-
During the dock repair, each sea valve must be disassembled, cleaned and ground wellBefore it reassemble the sealing surface between the valve and the valve seat should be checked by ____.
A.chief engineer
B.surveyor
C.the engineer
D.the technique personnel of the shipyard
-
The fence is in excellent repair.()
A.栅栏修好了
B.栅栏很完好
-
Is this the recorder you want________? A.to have repaired B.to repair it C.to have it repaired D.it repaired
-
View the Exhibit to examine the error during the database startup.You open an RMAN session for the database instance. To repair the failure, you executed the following as the first command in the RMAN session:RMAN> REPAIR FAILURE;Which statement describes the consequence of the command?()
<img src='https://img2.soutiyun.com/ask/uploadfile/2019-03-27/31f166c0cedddf6946f2b336e2153075.jpg' />
A. The command performs the recovery and closes the failures.
B. The command only displays the advice and the RMAN script required for repair.
C. The command produces an error because the ADVISE FAILURE command has not been executed before the REPAIR FAILURE command.
D. The command executes the RMAN script to repair the failure and removes the entry from the Automatic Diagnostic Repository (ADR).