The blowers of an inert gas generation system aboard a tanker,will be automatically secured if().
时间:2022-11-08
Upon arrival at the discharging port,the inert gas system is().
时间:2022-11-07
Spreading oil on the open sea has the effect of().
时间:2022-11-04
The component in an inert gas system used for cleaning the gas of solid and sulphur combustion products,while simultaneously cooling the inert gas,is called the().
时间:2022-10-29
Reid vapor pressure is().
时间:2022-10-22
Regulations require that cargo pumprooms on tank barges (constructed in 1965) carrying grades B or C liquid cargoes have power ventilation systems which can completely change the air in ().
时间:2022-10-21
Regulations require that tank vessels handling grade B liquids shall have their cargo pumps separated from all sources of vapor ignition by().
时间:2022-10-20
The fresh air intake of the inert gas system().
The designations A,B,C,D and E grades of cargo refer to the().
时间:2022-10-17
The combined fan discharge rate in an inert gas system is related to the().
时间:2022-10-16
Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall()the system in accordance with the requirements of that Regulation.
The purpose of inert gas systems aboard tankers is to().
时间:2022-10-15
()is not a process of weathering of the oil spilled in the sea water.
时间:2022-10-14
内部市场化管理以()为核心。
时间:2022-10-13
Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().
时间:2022-10-12