()is used for heaving up and slacking away the anchor and chain.
时间:2022-10-31
Oily rags stored in a pile that is open to the atmosphere are a hazard because they may().
时间:2022-10-28
The connection facilities for the international shore connection must be located to provide access().
Safe water buoys may show ONLY().
时间:2022-10-26
On a ship,how many ring buoys are required to have a buoyant line attached?()
时间:2022-10-23
A person referring to the stern sheets of a lifeboat is speaking of().
时间:2022-10-21
In launching a covered lifeboat,what would safely lower the lifeboat from inside the lifeboat cabin?()
时间:2022-10-18
Frapping lines are fitted to lifeboat davits to().
时间:2022-10-15
Fire fighting equipment requirements for a particular vessel may be found on the().
时间:2022-10-08
On a ship,firefighting equipment must be inspected once every().
时间:2022-10-02
Your vessel has lifeboats on both sides. Lifeboat No. 2 is located().
时间:2022-09-29
Line throwing equipment should not be operated().
A sheave is a().
时间:2022-09-25
If absolutely necessary,the best way to land on a beach in a motor lifeboat is to().
时间:2022-09-23
After abandoning ship,you should deploy the sea anchor from a liferaft to().
时间:2022-09-19