Compliance with the terms of the load line certificate on a ship is the responsibility of the().
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().
When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().
A load line of a ship is assigned by the().
My ship is()No.5 Berth for loading.
The Master or person in charge on a ship shall insure that line throwing equipment is not operated().
A ship is responsible for the cargo loaded or unloaded().
On commonly used ships,if two A√Cgenerators are operated in parallel, the load is distributed evenly by ().
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
For a ship not on an international voyage,an approved substitute for an impulse projected rocket-type line throwing appliance is a().
The primary purpose of a load line is to establish required().
Which mooring line is likely to undergo the most strain when docking a ship under normal conditions?()
The International Load Line Certificate is a document indicating () of the various load lines of the vessel.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
What is not accepted as the required shipping paperson a manned and loaded tank barge?().
When a ship in loaded condition floats at arbitrary water line, its displacement is to the relevant mass of water displaced by the ship()
The port clearance for a ship should be granted()the completion of loading or discharging in the port.
The International Load Line Certificate is a document indicating the()of the various load lines of the vessel.
The displacement of a ship is to the total weight, all told, of the relevant loaded ship()
When loading containers into the cell guides in the hold of a container ship,which statement is TRUE?().
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
(), where a ship is refitted for a different use.
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.