Compliance with the terms of the load line certificate on a ship is the responsibility of the().
The helicopter deck of a ship must be marked with the units identification,appropriate aiming circles,and a continuous line on the perimeter which is().
When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().
When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().
In a storm,the leeward lines of a ship’s mooring system will().
A branch line valve of a fire extinguishing system on a ship must be marked with the().
A ship is responsible for the cargo loaded or unloaded().
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
The primary purpose of a load line is to establish required().
The International Load Line Certificate is a document indicating () of the various load lines of the vessel.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
In a storm,the windward lines of a ship’s mooring system provide().
When a ship in loaded condition floats at arbitrary water line, its displacement is to the relevant mass of water displaced by the ship()
The condition where a ship on the end of a tow line is riding a wave crest at the same time as its tug rides a wave crest is known as riding in().
The International Load Line Certificate is a document indicating the()of the various load lines of the vessel.
()is the main center-line structural member,running fore and aft along the bottom of a ship,sometimes referred to as the backbone.
The displacement of a ship is to the total weight, all told, of the relevant loaded ship()
When loading containers into the cell guides in the hold of a container ship,which statement is TRUE?().
A load line for a ship is assigned by the().
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
On a ship crane,the load chart relates the allowable load to the combination of boom length and().
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.