Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
A . Order a POWER5 HMC
B . Connect to the existing HMC
C . Install an 8-port asynchronous card in the managed server to connect to the existing HMC
D . Install an additional network card to the existing HMC and connect to the POWER5 service processor
-
Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()
A . Remote Supervisor Adapter II (RSA II Slimline)
B . Management Module, which comes standard on the BladeCenter
C . Acoustic Attenuation Module
D . Ethernet NIC
-
Company.com has an EMC disk array and would like to connect it to a Virtual I/O Server on a pSeries p5-520. How can the EMC device drivers be installed?()
A . Use smitty install on the client partitions.
B . Use padmin command in the VIO Server.
C . Use the oem_setup_env environment in the VIO Server.
D . Use cfgmgr to detect/configure the devices within the client AIX partition.
-
A customer who is reducing their technical staff has requested an Intel server proposal from various vendors. Which of the following is most relevant to this proposal?()
A . Grid Computing
B . Active Energy Manager
C . Remote KVM
D . Systems Management
-
A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()
A . MRPDPlus tool
B . Inventory Services
C . PCRS6000 Portable Configurator
D . eConfig - IBM Configurator for e-Busine
-
A customer has a mixed Dell and IBM server environment. They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers. Which TWO features of IBM Director will be an advantage for this customer?()
A . IBM Director comes with free Aurema and SteelEye software plug-ins.
B . IBM Director supports non-IBM industry standard Intel based servers.
C . IBM Director servers can be managed from within the MS Performance Monitor.
D . IBM Director requires no agents to be installed and run on the IBM systems.
E . IBM Director offers agents to manage VMWare ESX Server and runs on Linux while Dell does not.
-
A customer has an existing rack environment with 18 x365 and 2 x255 servers. How can the customer monitor and manage the hardware even if the systems are shut down?()
A . Use PC Anywhere over the Ethernet LAN.
B . Use RDM and Aurema to manage the systems.
C . Connect high-speed modems to each of the systems’ serial ports to use IBM Director.
D . Interconnect the Remote Supervisor Adapters II (RSA II) in the x365 servers to the x255 servers.
-
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
A . A solution sizing questionnaire
B . Verify the customer has the proper racks
C . A Technical Delivery Assessment
D . Verify the customer has enough cooling in the computer room
-
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
A . 4
B . 8
C . 16
D . 32
-
A customer has 20 E1s to add between far-end nodes in an SNCP ring. What type of circuit would you recommend?()
A . LO-PATH circuits
B . HO-PATH circuits
C . 1:1 protection circuits
D . 1:N protection circuits
E . LO-PATH tunnel circuit
-
A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage. Which of the following arguments can the Sales Specialist present to best position IBM? ()
A . IBM’s ServerProven program is a reference that assures a customer of compatibility with specific third-party products.
B . IBM sells other vendors’ products and will test compatibility with the customer’s products.
C . B IBM’s storage division regularly tests their products with other vendors’ server products.
D . IBM’s server division regularly tests their products with other vendors’ storage products.
-
A customer with an EMC Clariion CX700 storage installation is considering a new IBM TotalStorage DS4500 solution. Which of the following is an advantage of the IBM DS4500 solution?()
A . Host port speed of 2Gb/s
B . Three-year hardware warranty
C . Heterogeneous Operating System support
D . Storage Manager software comes standard with DS4000 controller
-
The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()
A . Recommend the customer call EMC.
B . Recommend the customer call IBM hardware support.
C . Recommend the customer contact SupportLine.
D . Recommend the customer re-creates the volume groups.
-
A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()
A . Etherchannel and trunking
B . Network Interface Backup and Etherchannel
C . Shared Ethernet Adapter (SEA) Failover and Etherchannel
D . Network Interface Backup and Shared Ethernet Adapter failover
-
A customer is currently using EMC’s Mirrorview/A. Their primary site is 400 kilometers away fromthe secondary site, and they have an RPO of 4 hours. What is the IBM equivalent product?()
A . Global Copy
B . Sync Mirror
C . Metro Mirror
D . TPC for Replicatio
-
A customer has bought an IBM System Storage DS8700 and wants to attach ten SuSE Linux Enterprise Server hosts to the DS8700 with multiple paths. What is the Multipathing Driver the customer needs()
A . PowerPath
B . Subsystem Device Driver Device Specific Module
C . Subsystem Device Driver Path Control Module
D . DeviceMapper Multipath
-
A customer has the need for performance monitoring of an IBM System Storage DS8000. Which product does the customer need()
A . System Storage Productivity Center
B . Tivoli Storage Productivity Center for Data
C . Tivoli Storage Productivity Center for Disk
D . Tivoli Storage Productivity Center for Fabric
-
A customer is involved in an IBM critical situation (CritSit). The customer recently installed iDATAPIex. The business partner has been assessed a significant penalty by IBM. Which of the following is the reason for this action by IBM?()
A . The business partner was required to perform a TDA and failed to do so
B . The business partner recommended a nonworking configuration
C . The business partner did not support the customer correctly
D . The business partner failed to sell Remote Technical Support (RTS)
-
A medical customer has an installed HS21 blade with no local disk. They are attempting to set up boot from SAN using a Windows 2003 CD. Which sequence is correct for this procedure? ()
A . Install Windows from the CD using the QLogic driver provided on the CD, configure the LUN and zone for the target server, and then configure the blade UEFI to boot from SAN.
B . Configure the LUN and zone for the target server, install Windows from the CD and press F6 when prompted to supply the driver, and then configure the QLogic adapter BIOS to boot from SAN.
C . Configure the LUN and zone for the target server, configure the QLogic adapter BIOS to boot from SAN, install Windows from the CD, and then press F6 when prompted to supply the driver.
D . Configure the blade UEFI to boot from SAN, configure the LUN and zone for the target server, and then install Windows from the CD using the QLogic driver provided on the CD
-
A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()
A . Download the latest drivers from EMC for Red Hat Advanced Server.
B . Ensure that the EMC storage server is configured properly and has the latest firmware levels.
C . Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).
D . Ensure that the systems are connected to the EMC SAN controller.
-
A Business Partner storage specialist is proposing an IBM System Storage DS5000 solution to aninstalled EMC customer. Which IBM resource should the Business Partner engage to assist withcompetitive sales strategies against EMC?()
A . Competeline
B . Executive Briefing Center
C . Competitive Benchmark Center
D . Field Technical Support Specialist (FTSS)
-
An EMC customer is interested in storage virtualization. The IBM storage specialist has anappointment to discuss the SAN Volume Controller. Before making the call, which EMC productshould the storage specialist review?()
A . VNX
B . VPLEX
C . V-Series
D . USP-V
-
A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()
A . a disk-to-disk backup solution keeping all storage in the data center
B . a backup solution that includes magnetic tape that is shipped to an off-site storage facility
C . a less powerful copy environment at a hot site with asynchronous mirroring and cluster technology
D . an exact copy of the primary environment at a hot site with remote mirroring and cluster technology
-
Votwerk has business in more than 70 countries and regions and 650,000 employees globally, while in China it runs a plant, an innovation center and 28 customer experience stores.()
是
否