Compliance with the terms of the load line certificate on a ship is the responsibility of the().
Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().
The stevedores()load your ship in a few days.
The hoist line primarily used for lifting personnel on ship cranes is called the().
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
The system of derricks and winches has been largely replaced on newer ships by cranes()it is very efficient.
Stanchions prevent the entire deck load on a ship from being carried by the().
The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.
A load line of a ship is assigned by the().
A ship is responsible for the cargo loaded or unloaded().
On commonly used ships,if two A√Cgenerators are operated in parallel, the load is distributed evenly by ().
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().
The deck loads on a ship are distributed through the deck beams to the().
The load chart of a crane enables the operator to combine the load radius with boom length to determine the().
In cargo crane, () for lifting the load.
The displacement of a ship is to the total weight, all told, of the relevant loaded ship()
A load line for a ship is assigned by the().
The boom indicator on a crane will indicate the().
A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a().
Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
The design specifications for cranes and crane foundations on ship’s are set and published by the().
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.