Compliance with the terms of the load line certificate on a ship is the responsibility of the().
When there is not a chief officer on board,()should keep and write up the ship’s logbook.
The Garbage Record Book, as a part of the ship’s official logbook, shall be kept on board and preserved for a period of ()
If the buoyant force on a ship’s hull is equal to the displacement tonnage,the ship will().
The hoist line primarily used for lifting personnel on ship cranes is called the().
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
The system of derricks and winches has been largely replaced on newer ships by cranes()it is very efficient.
Stanchions prevent the entire deck load on a ship from being carried by the().
The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.
On commonly used ships,if two A√Cgenerators are operated in parallel, the load is distributed evenly by ().
The deck loads on a ship are distributed through the deck beams to the().
The load chart of a crane enables the operator to combine the load radius with boom length to determine the().
Our ship has not been to shipyard for a long time, the fouling on the ship’s hull greatly decreases her().
When arranging cargo for()in the holds,we should give first consideration to ship’s seaworthiness and her being in a good sea-going trim after loading.
The shearing stresses on a ship’s structure are usually greatest at().
The boom indicator on a crane will indicate the().
Which system(s) in the hydraulic systems of crane always hold(s) single side of load?()
Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
On a ship crane,the load chart relates the allowable load to the combination of boom length and().
()means a plan developed to ensure the application of measures on board the ship designed to protect persons on board, cargo, cargo transport units, ship’s stores or the ship from the risks of a security incident.
If the buoyant force on a ship’s hull is equal to the displacement tonnage, the ship cause().
The design specifications for cranes and crane foundations on ship’s are set and published by the().
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.