Compliance with the terms of the load line certificate on a ship is the responsibility of the().
A set of interior steps on a ship leading up to a deck from below is known as().
The helicopter deck of a ship must be marked with the units identification,appropriate aiming circles,and a continuous line on the perimeter which is().
On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().
The Chief Mate must ascertain that the deck loads are stowed in such a manner as().
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
Stanchions prevent the entire deck load on a ship from being carried by the().
The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.
A large oil fire on the deck of a ship can be fought most effectively with().
A load line of a ship is assigned by the().
The heavier outboard strake of deck plating on a ship is called the deck().
The duty of a deck winch is to lift and lower a load by means of a fixed rope on ().
On commonly used ships,if two A√Cgenerators are operated in parallel, the load is distributed evenly by ().
A set of interior steps on a ship leading up to a deck from below is know as().
Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().
On a ship,the deck stringer is the outboardmost deck().
Deck beams on a ship are generally spaced at equal intervals and run().
The deck plating on a ship is supported primarily by deck longitudinals and deck().
A load line for a ship is assigned by the().
A set of interior steps on a ship leading up a deck from below is known as().
The decks of a ship are supported by transverse members called().
On a ship crane,the load chart relates the allowable load to the combination of boom length and().
A cutoff valve in the fire-main system of a ship may be closed to protect the portion of the system on an exposed deck from().
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.